McKelvey Woods Court Reconstruction

Contractor: J.M. Marschuetz Construction

Notice to Proceed: November 2012

Construction Status: Under Construction

Estimated Completion Date: Spring 2013

Contact: Cliff Baber, (314) 738-2258

Project Description: This project provides for the removal of existing improvements and the construction and/or installation of a new concrete pavement, granular base, curbs and gutters, sidewalks, storm sewers and appurtenances, small block retaining walls, streetlight conduit, traffic signal detection loops, pavement striping, fencing, sodding and other related improvements. A roundabout will be constructed at the intersection of McKelvey Road and McKelvey Hill Drive.

Capital Projects

McKelvey Woods Trail - Phase 1

Contractor: Kozeny-Wagner, Inc.

Notice to Proceed: November 2012

Construction Status: Under Construction

Estimated Completion Date: Summer 2013

Contact: Cliff Baber, (314) 738-2258

Project Description: This project includes the construction of approximately 3/4 miles of trail 10 foot wide trail consisting of both asphalt and concrete pavement on 4 inches of aggregate base. Work also consists of ditches, culverts, a BMP, slope stabilization, modular block retaining wall construction, pedestrian bridges, fencing, plaza and plantings. The work consists of furnishing all material, labor, tools, equipment and supervision necessary for the construction of the items noted above in accordance with all the requirements of these specifications, and the drawings made a part thereof. Existing amenities damaged during construction will be replaced at no cost to the owner.

Capital Projects